
Projects completed or under way include
> Tallest Reinforced Earth structure ever built in the history built in Tindharia, India raising to a height of 102.8m;
> Design build of 2,000,000 square feet (186,000 m²) of Reinforced Earth walls; 15,000 linear feet (4.6 km) of coping and 120,000 linear feet (36.6 km) of half-connector barriers for the Transform 66 Outside the Beltway project, in Virginia, USA;
> Design and supply of 31,000 m² of TerraTilt and TerraPlus facings as part of the NorthLink West Australia road project;
> 8,500 m² of a GeoStrap and GeoMega system for the Mae Khem Interchange in Thailand;
> 4,000 m² of TerraPlus system for the Spence Growth Operation Project at the BHP Billiton – Spence Copper Mine in Chile.
Our latest projects
Supporting the duplication of provincial road 4014 in Rabat with a Reinforced Earth solution
Geoquest Maroc contributed to the duplication of the provincial road 4014 in Rabat, a key infrastructure project. The objective was to improve traffic conditions between Rabat and Ain Aouda, particularly during peak hours, while [...]
Enhancing connectivity in Paulínia with our Reinforced Earth solution
Located in the state of São Paulo, the city of Paulínia is part of one of Brazil’s most dynamic and industrialized regions. As urban development continues to expand, improving traffic flow and connectivity [...]
T-Wall solutions supporting the Ontario Line Corridor in Toronto
The Lakeshore East Joint Corridor Early Works in Toronto are part of the new Ontario Line, a 15.6 km subway project improving mobility, public transport capacity, and urban connectivity across the city. Linking Exhibition [...]
Reinforced Earth walls for a key crushing facility in Peru
Freyssinet Geoquest Peru participated in the expansion of copper production in Peru. In this mine, it was necessary to relocate the primary crusher, which led to the construction of a new crushing unit and [...]





